Concrete Prep & Leveling

Professional concrete preparation and leveling services. We ensure your subfloor is properly prepared for new flooring installation.

Concrete preparation and leveling work

Who This Service Is For

Property managers, building owners, and contractors who need concrete subfloor preparation before installing new flooring. Whether your concrete has cracks, low spots, high spots, or surface imperfections, proper preparation is essential for successful flooring installation.

What's Included

  • Concrete surface assessment and moisture testing
  • Grinding high spots and surface imperfections
  • Filling low spots and depressions
  • Patching cracks, holes, and damaged areas
  • Surface cleaning and preparation
  • Leveling compound application when needed
  • Final surface preparation for flooring installation

Our Prep Process

We start with a thorough assessment of your concrete subfloor, including moisture testing. Our proposal details all necessary prep work, timeline, and pricing. Once approved, we coordinate scheduling. During prep, we address all surface imperfections, level the floor, and prepare it for your chosen flooring material. We ensure the surface meets manufacturer specifications and industry standards. After prep is complete, the subfloor is ready for flooring installation.

Common Use Cases

  • Preparing new construction concrete slabs
  • Repairing damaged or uneven existing concrete
  • Preparing concrete after flooring removal
  • Leveling floors for sensitive flooring materials like LVT
  • Preparing concrete for moisture-sensitive flooring

Frequently Asked Questions

Why is concrete preparation important?

Proper concrete preparation ensures your new flooring adheres correctly, performs as expected, and lasts for its intended lifespan. Poor preparation can lead to flooring failures, moisture issues, and premature wear.

What does concrete leveling involve?

Concrete leveling includes filling low spots, grinding high spots, patching cracks and holes, and creating a smooth, level surface suitable for your chosen flooring material.

How long does concrete prep take?

Prep timelines vary by condition and square footage. Most prep work takes 1-3 days. We assess conditions during our site walk and provide detailed timelines in our proposals.

Do you test for moisture?

Yes. We perform moisture testing as part of our prep process. If moisture levels are elevated, we recommend and install appropriate mitigation systems.

Can you work on occupied buildings?

Yes. We can perform concrete prep work during off-hours or in phases to minimize disruption to your operations.

Need Concrete Preparation?

Contact us for a free site walk and detailed proposal for your concrete prep project.

Request a Quote